This website uses cookies and other tracking technologies to enhance navigation, facilitate feedback, analyze usage of our products and services, support marketing efforts, and deliver third-party content. View our Privacy Policy.
Innovative Battery Manufacturing Facilities Construction management consultancy for building innovative battery manufacturing facilities in the United States. Bechtel is at the forefront of constructing innovative battery manufacturing facilities in the U.S. Our expert team ensures compliance with local codes and…
The Bechtel-built mine, one of the largest copper resources, features a first-of-its-kind desalination plant and will operate on 100% renewable energy by 2025.
Bechtel is delivering one of Australia’s largest infrastructure projects — a state-of-the-art airport designed to handle 10 million passengers annually.
A Bechtel-led team has started destroying GB nerve agent rockets at the Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP), near Richmond, Kentucky. The M55 rockets are the last weapons to be destroyed at BGCAPP, representing more than 50% of the original Kentucky stockpile.
Destruction of the rockets is another step in the effort for the U.S. to eliminate all chemical weapons by September 30, 2023, meeting an international treaty commitment for the country.
Just three months ago the Blue Grass team completed the destruction of more than 17,000 rockets containing VX nerve agent, the fourth campaign completed at BGCAPP. A “campaign” refers to destruction of a particular type of chemical munition.
“Our constant theme throughout every campaign has been ‘safety’ and it will remain our theme as we destroy rockets containing GB nerve agent,” said Ron Hink, project manager. “Our Blue Grass team is ready to finish our mission of destroying every chemical weapon stored in Kentucky.”
The chemical weapons stockpile in Kentucky originally consisted of 523 U.S. tons of chemical agent configured in 155mm projectiles containing mustard and VX nerve agent, 8-inch projectiles containing GB nerve agent, and M55 rockets containing GB and VX nerve agent.
The mustard destruction was completed in September 2021. GB nerve agent in 8-inch projectiles was destroyed in 2020 while VX nerve agent in projectiles was destroyed in 2021.
About Bechtel
Bechtel is a trusted engineering, construction and project management partner to industry and government. Differentiated by the quality of our people and our relentless drive to deliver the most successful outcomes, we align our capabilities to our customers’ objectives to create a lasting positive impact. Since 1898, we have helped customers complete more than 25,000 projects in 160 countries on all seven continents that have created jobs, grown economies, improved the resiliency of the world’s infrastructure, increased access to energy, resources, and vital services, and made the world a safer, cleaner place.
Bechtel serves the Energy; Infrastructure; Manufacturing & Technology; Mining & Metals; and Nuclear, Security & Environmental markets. Our services span from initial planning and investment, through start-up and operations. www.bechtel.com
Bechtel Completes First Container Pour at Vitrification Plant in Washington State
Bechtel announced today that it has successfully completed the first set of test glass pours into a stainless-steel storage container designed to hold vitrified radioactive and chemical waste. This is a critical step in the Department of Energy’s mission to...
Bechtel today named Senior Vice President Brian Hartman as project director for the Waste Treatment and Immobilization Plant (WTP) project at the U.S. Department of Energy’s (DOE) Hanford Site in Washington state. Hartman is a 40-year Bechtel veteran with extensive...
Bechtel Company Assumes Responsibility of Waste Isolation Pilot Plant
Salado Isolation Mining Contractors completes transition to operate the U.S. defense nuclear waste disposal facility in New Mexico A Bechtel company, Salado Isolation Mining Contractors LLC (SIMCO), has assumed responsibility for managing and operating the only deep underground repository for...
How the U.S. Can Build the Best High-Speed Network Yet
By: Jake Mumm
Today, our nation finds itself in a similar position. With high-speed rail systems gaining traction worldwide—and significant networks already established in Asia and Europe—faster travel times, reduced congestion, and interstate connectivity across North America beckon.
Brendan Bechtel Statement on Energy and Innovation Summit
By: Brendan Bechtel
Brendan Bechtel joins President Trump, Senator McCormick, and other business, government, and labor leaders in Pittsburgh at the Energy & Innovation Summit for a crucial conversation on America’s leadership in AI and energy.
Forty years ago, Cole McClure Jr., a geophysics expert at Bechtel, developed an innovative solution to protect critical infrastructure from earthquakes. His patented seismic shield — a trench filled with soft, flexible materials such as liquids — helped block destructive…
Bechtel studied Yucca Mountain as a potential U.S. nuclear waste repository, leveraging advanced engineering and analysis to explore safe, long-term disposal solutions.