This website uses cookies and other tracking technologies to enhance navigation, facilitate feedback, analyze usage of our products and services, support marketing efforts, and deliver third-party content. View our Privacy Policy.
Innovative Battery Manufacturing Facilities Construction management consultancy for building innovative battery manufacturing facilities in the United States. Bechtel is at the forefront of constructing innovative battery manufacturing facilities in the U.S. Our expert team ensures compliance with local codes and…
The Bechtel-built mine, one of the largest copper resources, features a first-of-its-kind desalination plant and will operate on 100% renewable energy by 2025.
Bechtel is delivering one of Australia’s largest infrastructure projects — a state-of-the-art airport designed to handle 10 million passengers annually.
Two decades ago, the Department of Energy (DOE) launched a mission to build a one-of-a-kind complex at the Hanford Site in Washington state to transform World War II and Cold War era radioactive and chemical waste into a stable glass form, making this one of the most challenging environmental projects in history. Bechtel is honored to have been chosen as the DOE’s partner, and we’re proud of our thousands of men and women who will deliver this critical project.
The DOE selected Bechtel’s team of engineers to design, construct, and commission this multi-facility complex, known as the Waste Treatment and Immobilization Plant.
Bechtel completed the first phase of construction, the Low-Activity Waste Facility, in 2021, after which the team transitioned to commissioning the plant. In July of 2023, the first of two 300-ton melters, the chosen technology to transform the waste into a stable form, a process known as vitrification, reached its operating temperature of 2,100 degrees Fahrenheit.
Our History at Hanford
The waste being treated at Hanford dates to the Manhattan Project of the 1940’s. The Hanford site is in southeastern Washington along the longest undammed stretch of the Columbia River.
The site was selected to build reactors that produced plutonium for World War II, and the site continued operating during the Cold War. Between 1943 and 1987, nine reactors were built and used to generate plutonium for the U.S. government.
The production of plutonium created 56 million gallons of radioactive and chemical waste, which was stored in 177 underground single-shell and double-shell tanks at the site. The tanks are corroding and require constant maintenance. Removing the waste from the tanks and converting it to a more stable form is needed to protect the nearby Columbia river. That’s where we come in.
Bechtel is proud to have contributed to solutions for Hanford site projects since the 1990’s. Today’s mission continues that legacy of partnership with the DOE through designing the Waste Treatment and Immobilization Plant, that will treat this legacy waste.
Inside The Project
The Bechtel-designed facilities at the Waste Treatment and Immobilization Plant (WTP) are currently being completed in two phases, with the first phase being the Low-Activity Waste Facility, currently in commissioning. The High-Level Waste Facility is the second phase.
The WTP facility is sometimes called the Vit Plant because it uses a technique called vitrification that mixes the liquid waste with materials that cool to form solid glass. Vitrification begins with heating glass-forming materials in the melters until they reach a molten state, and then feeding the radioactive and chemical tank waste into that mixture. Once incorporated, the mixture of glass forming materials and waste will be poured into specially designed stainless-steel containers to cool and solidify into glass, or vitrified, form.
In the first phase of operations, WTP’s Low-Activity Waste Facility will produce about 1,100 containers of immobilized waste per year, which will be stored at the Hanford Site’s Integrated Disposal Facility.
Building Support Facilities
In addition to the facilities that house the melters, Bechtel has designed extensive facilities to support the site, including an Analytical Laboratory. The Analytical Laboratory, declared Ready to Operate in 2021, will allow team members to characterize waste constituents, verify the material quantities needed to form glass, and confirm that the glass produced by the Low-Activity Waste facility meets regulatory requirements and standards.
Bechtel designed the laboratory to handle the frequent samples that will be taken during plant operations. Approximately 3,000 process samples will be analyzed by the laboratory staff per year to confirm high-quality glass product and good process controls.
Our People at WTP
Bechtel employees have applied their full range of talents toward addressing the unprecedented challenge of building a first-of-a-kind multi-facility complex to treat this radioactive and chemical waste.
From employees who have been on the project since it first started over two decades ago, to subject matter experts who have shared their expertise during design, procurement, construction, and commissioning, Bechtel employees have been a key part of progress and innovation at the site.
Success at the Waste Treatment Plant project has come from a collaborative approach with our customers, our team, our partners, and the local community.
Serving the Local Community
Throughout the last 20 years, Bechtel has formed relationships with the local Tri-City communities of Richland, Pasco, West Richland, and Kennewick.
In the first phase of operations, WTP’s Low-Activity Waste Facility will produce about 1,100 containers of immobilized waste per year, which will be stored at the Hanford Site’s Integrated Disposal Facility.
Bechtel’s WTP team regularly engages with local charitable organizations through volunteering and sponsorships. Key partnerships in the local community include: WSU Tri-Cities Tutoring Center; Hanford REACH Interpretive Center; United Way of Benton and Franklin Counties; Junior Achievement; Boys & Girls Club of Benton and Franklin Counties; and Friends of Badger Mountain.
Related Resources
South Carolina, U.S.
Savannah River Remediation
2020
Bechtel’s Savannah River Remediation safely processed Cold War-era radioactive waste, closing waste tanks, saving $500M, and advancing U.S. nuclear cleanup efforts.
The Advanced Mixed Waste Treatment Plant safely processed and shipped 58,000 cubic meters of radioactive waste, achieving DOE cleanup goals ahead of schedule.
Bechtel Completes First Container Pour at Vitrification Plant in Washington State
Bechtel announced today that it has successfully completed the first set of test glass pours into a stainless-steel storage container designed to hold vitrified radioactive and chemical waste. This is a critical step in the Department of Energy’s mission to...
Bechtel today named Senior Vice President Brian Hartman as project director for the Waste Treatment and Immobilization Plant (WTP) project at the U.S. Department of Energy’s (DOE) Hanford Site in Washington state. Hartman is a 40-year Bechtel veteran with extensive...
Bechtel’s Valerie McCain Recognized for Leadership at Key Nuclear Cleanup Facility
Bechtel announced today that Valerie McCain, the late project manager at the Hanford Waste Treatment and Immobilization Plant (WTP) in Washington state, was named a Top 25 Newsmaker for 2023 by Engineering News-Record magazine. McCain, who passed away after a...
What’s New About America’s Next Nuclear Power Plant? Everything
By: Craig Albert
Groundbreaking ceremonies are familiar for Bechtel. Along with our customers and labor partners, we’ve participated in this custom hundreds of times all over the world. These are always special. But even more so when the groundbreaking is truly breaking new...
Brendan Bechtel on Rebuilding America’s Leadership in Nuclear Power
By: Brendan Bechtel
The U.S. is once again building and innovating in nuclear power. This week, the second of two new nuclear units went into service in Georgia. Meanwhile, developers in Wyoming just filed permit applications for America’s next nuclear plant, Natrium, using...
Lawrence Livermore National Laboratory’s (LLNL) fusion breakthrough was featured on 60 Minutes, highlighting the work of the team at the laboratory’s National Ignition Facility (NIF). On December 5, 2022, ignition was achieved at NIF when an experiment produced more energy...