Supporting civilian and national defense programs

Bechtel has a proud history of serving space launch facility and missile infrastructure customers that dates back to the early 1960’s. We stand ready to bring our decades of experience to your most complex space and launch infrastructure projects. To schedule a meeting with our experts, click here.

Key Projects

Widget Image

Arnold Engineering Development Complex

Bechtel leads the team executing test operations and sustainment for Arnold Engineering Development Complex, the ground test facility where nearly every U.S. aerospace system proves itself in massive wind tunnels, test stands, and climate chambers.

Widget Image

Launch Complex 40`

Launch Complex 40 at Cape Canaveral, required extensive corrosion control systems, triple-redundant HVAC systems, a cryogenic propellant system, and extensive infrastructure modifications on a fast-track design and construction schedule. 

Widget Image

Ground-based Midcourse Missile Defense

Bechtel performed design, procurement, fabrication, and installation of launch systems in Alaska and California, and a $200 million test bed program.

In 1961, when President Kennedy challenged Americans to put a human on the moon by 1970, the Bechtel organization had already been building space launch facilities for three years. We supported the Gemini and Apollo programs, readying launch pads, research centers, test facilities, space simulators, and assembly buildings. We have designed and built facilities for assembling and launching space launch vehicles and spacecraft, including the two most advanced launch facilities in the world at the time, Space Launch Complex 3-East at Vandenberg Air Force Base and Launch Complex 40 at Cape Canaveral.

Technical Capabilities

We provide a full spectrum of technical services, including conceptual trade studies, systems integration, operations planning, and design of:

  • Complex structural and blast-resistant facilities
  • Innovative mechanical movement systems, including bridge cranes, access platforms, lifting hoists, and handling systems
  • Ultra-high-pressure gas, triple-redundant HVAC, corrosion protection, and other systems
  • Clean enclosures and other specialized facilities
  • Physical and electronic security and access control systems

Our customers and their missions benefit from efficiencies gained from more than 120 years of global megaproject delivery.

Innovating for the Future

Bechtel innovations are helping customers daily. They include:

  • $60 million investment in developing new means and methods of construction
    • Additive construction and manufacturing (3D printing)
    • Collaborations on autonomous and semi-autonomous machinery
    • Engineering and Construction Innovation Center testing wearable tech, VR/AR, robotics
  • Building Information Modeling innovations
    • 4D (time),
    • 5D (resource-based)
    • 6D (facility operations-based) applications
  • Domain knowledge in:
    • Full EPC and PM services
    • Physical, electronic, cyber security; NIST Framework
    • Quality Management Systems: ISO 9001:2015, DOE NQA-1, AS9100, MDA MAP
    • Unmatched worker safety performance