IPSI LLC ‘s gas processing experience extends to downstream gas monetization & oil production technologies such as:
Select Project Highlights
|
Location |
Client |
Project |
Year |
|
Southern Mexico |
PEMEX E&P |
Master Planning and Technical assistance related to onshore and offshore oil/gas production, transportation and processing facilities in the Southern Region of Mexico. Key issues are crude blending and processing of light, medium and heavy crudes to achieve contract specifications while optimizing the use of existing infrastructure. |
2004-2007 |
|
North Sea, Norway |
Norsk Hydro |
Performed a third party audit of the Fram Vest subsea and topside production facilities including water separation, treatment and sales gas compression. Investigated procedures for hydrate prevention under normal operation, startup and shutdowns; identified problem areas and recommended solutions. |
2001 |
|
Grand Bay and Eugene Island Block 208 |
Pioneer Resources |
Process design and trouble-shooting for two facilities offshore. |
1997 |
|
Norway |
Norsk Hydro |
Third party design verification for the Sture Terminal crude stabilization facilities. |
1996 |
|
|
ARCO Int’l. Oil & Gas |
Evaluate workability of a heavy crude stabilizer (<10% asphaltene) and identify problem areas in design/operability of the tower concept. |
1995 |
|
Bakersfield, California |
BPOI/Department of Energy |
Process Assistance to the Elk Hills Petroleum Reserve |
1994 |
|
Mexico |
CIPI |
Process study to optimize the 34 existing Pemex production facilities to improve efficiency and safety (1.7 BSCFD, 600 BPD Oil). |
1993 |
|
Anaco, Venezuela |
Corpoven, SA |
Prepared plant and personnel for performance test to determine maximum throughput of extraction plant to determine feasibility of upcoming revamp |
|
|
Maturin, Venezuela |
Intevep, SA |
Consulting Services related to solving asphalt deposition problems on gas pipelines in Eastern Venezuela |
|
|
North Slope, Alaska, USA |
ARCO Research & Development |
Design and fabrication of fuel test separator with very short residence time. Partners with H. O. Mohr Research & Engineering. |
1990 |
|
Puerto La Cruz, Venezuela |
Corpoven, SA |
Study to minimize production losses of 55,000 BPD extraction facility to increase throughput from 800 MMSCFD to 1000 MMSCFD. Included 70,000 BPD fractionation facility being modified to handle 100 MBPD. |
1989 |
|
Anaco, Venezuela |
Corpoven, SA |
Technical assistance related to the expansion of the San Joaquin gas plant and CO2-removal facilities. |
|
|
Venezuela |
Maraven, SA |
Analysis of future requirements of handling heavy crude produced from steam injection. Evaluation of various methods to dehydrate crude, treat and dispose of produced water. |
|
|
North Sea, Norway |
Norsk Hydro |
Management of dynamic simulation of Oseberg subsea oil pipeline system including tie-ins with Veslefrikk |
1988 |