|
Client/Location |
Description |
Year |
|
Duke Energy |
A 240 LTPD sulfur recovery facility including two 120 LPTD Claus sulfur recovery units and one tail gas treating system on a coal gasification facility |
2012 |
|
ConocoPhillips |
Preliminary design and cost estimating for a multiple option EOR CO2 Recovery and repressuring system with hydrocarbon recovery.
|
2010 |
|
Conoco-Phillips |
Feasibility study for 12000 LTPD sulfur recovery facility (gas treating, Claus sulfur recovery, and tail gas treating) processing 35% H2S natural gas stream that included CO2 recovery. |
2010 |
|
Various Clients |
Preliminary designs and cost estimates for a number of studies on coal gasification systems, sulfur recovery facility, including sulfur recovery units, tail gas treating, and recycle unit and thermal oxidizing unit for power generation and polygeneration clients. Capacities ranged from 176 to 230 LTPD of sulfur. |
2002-2007 |
|
Suncor, Fort McMurray Alberta, Canada |
537 LTPD SRUs and 640 GPM SWS and 1000 GPM amine; process license extension |
2004 |
|
Suncor, Fort McMurray Alberta, Canada |
2 @ 537 LTPD SRUs and 1 @ 875 LTPD TGTU with 470 GPM SWS and 3000 GPM amine; process license |
2001 |
|
Anaconda (Murrin Murrin) Operations Western Australia |
2 @ 64 MTPD H2S Production Units; Process License |
1999 |
|
Aramco, Ras Tanura Saudi Arabia |
2 @ 3000 LTPD SRU with degassing, with 440 GPM SWS and 1600 GPM amine |
1998 |
|
Maraven Cardon, Venezuela |
2 @ 180 LTPD SRU and TGTU with amine, SWS, and degassing |
1996 |
|
Pacific Resources Inc. Malaysia |
530 STPD H2SO4 |
1995 |
|
PTT Thailand |
0.5 LTPD LO-CAT |
1993 |
|
Phillips Petroleum Co. Woods Cross, Utah |
10 LTPD amine and SRU with SWS revamp |
1993 |
|
Star Enterprise Port Arthur, Texas |
3 @ 192 LTPD SRU and TGTU with amine and SWS |
1992 |
|
Texaco Bakersfield, California |
70 LTPD SRU and TGTU |
1992 |